Engineering Change Management is a central logistics function that can be used to change various aspects of production basic data (for example, BOMs, task lists, materials, and documents ) with history (with date effectivity) or depending on specific conditions (with parameter effectivity).
A change with history has the following distinctive characteristics:
- It takes effect under precisely defined conditions (precise date or specific effectivity parameter value).
- The changed object is saved twice: in its state before and after the changes.
- A change master record or ECR/ECO controls and documents the changes.
This Training Course covers detailed training on Engineering Change Management. The following Topics are covered under this training course.
1. Creating, Changing and Displaying an Engineering Change Number
2. Using Product Structure Browser with Change Requests
3. Setting up Validity dates and the significance of Alternate implementation Dates in Change requests
4. Redlining the Changes
Executing and Approving Changes.